Methodology Update—TeamMate Update July 2024
Jul-2024

Target audience: All Attest Auditors

Effective date: Immediately

Description of subject: This update includes changes to the TeamMate Cabinets and the templates and checklists. Significant changes to the methodology are summarized below.

Key changes are:

  • Updates to all TeamMate library cabinet, which includes the following four cabinets as well as templates and checklists.

    • The Annual Audit Procedures Cabinet
    • The Annual Audit Procedures—Supplement Cabinet
    • The IFRS Procedures—Cabinet
    • The PSAS Procedures—Cabinet
  • Substantially all procedures, in all cabinets as well as templates and checklists have been modified to update the font and colour scheme as we move away from our strategic alliance contract. Unless specified below in this announcement, the modifications are editorial and limited to the layout of the documents (colours and font) with no significant modifications to the content.

  • The TeamMate library Annual Audit Procedures cabinet has been updated to include the procedures from the shared PROxI folder 2332306 that were published in October 2023. As such, all annual audit procedures stored in the shared PROxI folder 2332306 will be removed.

  • Improvements to the Annual Audit Procedures cabinet to align the procedure type ‘Engagement Leader’ with procedures “Engagement leader and team manager—Planning sign‑off” and “Engagement leader and team manager—Completion sign‑off”.

  • Improvements to the ‘’Engagement Quality Reviewer checklist and sign‑off (CSQM 2)’’ template.

  • Improvements to the ‘’External Firms/Auditors (Non‑OAG) Letter of Instruction Template for Use on Group Audits’’ template.

  • Updates to the ‘’Engagement Letter’’ template to align with CAS 600 (Revised).

  • Minor improvement to the ‘’Audit Planning Template’’.

Note: other than the modifications made to the Engagement Letter, this update does not include the necessary changes to the remaining methodology to comply with CAS 600 (Revised). Updates to our methodology for CAS 600 (Revised) will be incorporated in a future methodology update.

Update to the TeamMate library Cabinets (other than specified below)

Required action: 

Upon release of this announcement, audit teams are expected to integrate the updated TeamMate library Cabinets (updated for font and colour scheme) into their audit files. In doing so, audit teams could establish a plan to ensure that all procedures in their audit files have been replaced, with the updated procedures, within a reasonable time frame. The plan can consider upcoming updates, such as CAS 600 (Revised), where transition to the related ‘’new/updated’’ group audit procedures will be inevitable.

Annual Audit Procedures Cabinet

Required action: 

Ensure to use the most updated Annual Audit Cabinet for TeamMate files created post this announcement or files where no work has yet commenced.

Program (PRG) Procedure Step Change

A.1.PRG—Audit Mandate and Client Acceptance and Continuance

CPA Canada licence Agreement

Copyright date changed from 2023 to 2024.

A.2.PRG—Timetable and Engagement Management

Independence and ethical requirements

Added the procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Planning sign‑off” procedure.

General engagement decisions

Removed procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Planning sign‑off” procedure.

B.3.PRG—Internal Control Framework

Understand and evaluate the components of the entity’s system of internal control

Removed procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Planning sign‑off” procedure.

Understand and evaluate the components of the entity’s system of internal control—Control activities

Removed procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager— Planning sign‑off” procedure.

Identify IT risks and understand and evaluate related ITGCs

Removed procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager— Planning sign‑off” procedure.

B.4.PRG—Assess Risk

Understand accounting estimates

Enhanced steps to update procedure reference included in the shared PROxI folder 2332306 in October 2023.

Reference to procedure document

P_01713E_Understand_accounting_estimates

has been replaced by

P_01800E_Understand_accounting_estimates.

Determine scoping and perform inherent risk assessment—TeamMate

Enhanced steps to update procedure reference included in the shared PROxI folder 2332306 in October 2023.

Reference to procedure document

P_01706E_Determine_scoping_inherent_risk_assessment.

has been replaced by

P_01801E_Determine_scoping_inherent_risk_assessment.

Updated the wording to remove reference to the ‘Audit Planning Template—Instructions—CAS 315’.

C.1.PRG—Materiality

Determine materiality

Added the procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Planning sign‑off” procedure.

C.2.PRG—Develop Audit Plan

Determine audit strategy and plan

Enhanced steps to update procedure reference included in the shared PROxI folder 2332306 in October 2023.

Reference to procedure document

P_01730E_Det_audit_strategy_and_plan

has been replaced by

P_01802E_Det_audit_strategy_and_plan

Updated the wording to remove reference to the “Audit Planning Template—Instructions—CAS 315”.

D.1.PRG—Completion and Reporting Activities

Update initial assessment of independence

Added the procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Completion sign‑off” procedure.

D.2.PRG—Financial Statements and Notes

Submit final documents to AEA

Removed procedure type ‘Engagement Leader’ to align with the “Engagement leader and team manager—Completion sign‑off” procedure.

Annual Audit Procedures—Supplement Cabinet

Required action: 

Ensure to use the most updated Annual Audit—Supplemental Cabinet for TeamMate files created post this announcement or files where no work has yet commenced.

Program (PRG) Procedure Step Change

C.1.PRG—Quality Reviewer

Engagement Quality Reviewer—Planning sign‑off

Updated step to remove reference to EQR checklist in used for audits of financial statements for periods beginning before 15 December 2022.

Engagement Quality Reviewer—Completion sign‑off

Updates to templates

The following is a summary of all revisions other than editorial revisions and any actions that need to be taken:

General

Engagement Quality Reviewer Checklist and Sign‑off (CSQM 2)

Improvement made to the template to facilitate the EQR review.

The updated template must be used for engagement quality reviews commencing after this announcement.

General

Quality Reviewer Checklist

Deleted

This checklist is removed (outdate). EQR must use the ‘Engagement Quality Reviewer Checklist and Sign‑off (CSQM 2)’ checklist.

Planning

Audit Planning Template

Minor improvements to the template to:

  • Update the substantive procedure library to match the accounting update released in October 2023

  • Align the level of evidence for substantive testing with OAG Audit Manual (replace ‘Medium’ for ‘Moderate’).

Audit teams are allowed to continue using the previous version of the template.

Planning

Engagement Letter

Updated to align with new CAS 600 (Revised) requirement related to agreeing the terms of the audit with group management.

The updated template must be used for audits of group financial statements for periods beginning on or after December 31, 2023.

The changes made to the Engagement Letter are not relevant for non group audits. However, it is good practice for audit teams to always use the most recent templates available on the INTRAnet.

Planning

External Firms/Auditors (Non‑OAG) Letter of Instruction Template for Use on Group Audits

Editorial changes to the appendix on Confirmations regarding the Component Auditor Firm’s System of Quality Management and the Component Auditor’s Engagement Resources.

The updated template needs to be used by all audit teams moving forward.

Annual Audit Templates
Phase Template Name Change Action Required/Impact